You dont have javascript enabled! Please enable it!

Royal Alberta Museum

Project Details
  • Project Categories
  • Project NameRoyal Alberta Museum
  • Alternate NameRAM
  • Scopes of WorkDesign Assist, Steel Studs, Drywall, Insulation, Acoustic Ceilings, Duct Liner, Plywood Sheathing and Rigid at Parapets, Fire Caulking Perimeter, Stucco
  • SpecialtiesGallery Load Wall Design, Raised Floor Framing, Metal Ceilings, Duct Liner, Tape-In Base Boards / Corner Guards, Stucco Soffits, Acoustic Plaster Ceilings
  • Delivery TypeDesign Assist, Lump Sum
  • Client NameLedcor
  • Project LocationEdmonton
  • Floor Area419,000 sqft
  • Project Value>$10,000,000
  • Year Completed2018
  • Project Duration34 months
  • Social Share
Project Insights

Scroll through the photos to reveal even more (5 of ? shown). Click for more controls.

Located in the downtown Arts & Entertainment District, across the street from City Hall and the Law Courts, the new Royal Alberta Museum (RAM) became the largest museum in western Canada.
Baytek was selected as a ‘Design Assist’ contractor to consult and advise on the wall and ceiling scope of work throughout the design process. With the design process complete, Baytek carried into the construction and completion of the new facility.

 

  • International design competition
  • LEED® Silver Application
  • Award of Merit (Gift Shop): Interior Design – PDA
  • 419,000 sqft of total space
  • 82,000 sqft of gallery space
  • Twice the size of the existing museum
  • Behind the scenes work is more visible
  • Improved shop, cafe, patio, group arrivals, and outdoor space
  • Removal of previous Canada Post distribution centre
  • Use of Canada Post building art pieces and relics
error: Sorry, content is protected.